Created
Bike lane completely closed. Merge with traffic required.
Thanks, Dan. Does this looks short or long term?
I'm leaning long term - the construction there has been ongoing all summer and it was previously a concrete barricaded bike lane that entire time. The lane blockage was also not just a temporary sign. They've expanded their entire construction footprint with chain link fencing and barricading into the bike lane.
Avi S accepted this suggestion.
Thanks. Please comment here when it improves.
Last Activity
Duration
Over 2 weeks
Status
Accepted