One way road with side walk
Is there a need to add a 35W crossing to the network here? A bikeway will be constructed here in 2027/2028 but we could add an interim connection somewhere
The map routed me through here which sucked but I see it's not part of the low or even medium stress map... Curious that it had me go this way
Approximately from which point to which point?
Curious as to why the map didnβt route you to cross via 40th
Yeah with current conditions thereβs absolutely ZERO infrastructure between 29th and 40th. Not even a painted lane. So I guess makes sense it route through here in some instances
If youβre already taking 34th then a short sidewalk ride is probably weighted over a 6 block detour in either direction
Save me 34th/35th/36th construction save me
https://www.eventbrite.com/e/34th-street-bike-audit-south-uptown-lyndale-tickets-1999178711342 for anyone whoβs available and interested this Saturday! Chris is conducting an audit of the existing quality of bicycle facilities in this area and Iβm planning on joining him. I wanna see how he does it and see if we can emulate it in some of the western suburbs that desperately need some attention
I guess Iβm curious how Google Maps wouldβve routed Cas in this instance too
We might just have to stoop to Google Maps level every once in a while when thereβs clearly a huge gap in infrastructure
Looks like google maps diverts you to 31st or 38th. Both bad options but slightly closer than 29th/40th
Which is the closest to not dying between 31st, 38th and 35th?
I would rather the detour than that horrible skinny sidewalk lol
Me too - which is why Iβm surprised the routing didnβt put you on 40th. Iβll get Avi to investigate this
I think 38th sidewalk might be the best option short of going all the way to 29th/40th. 31st is heavy traffic so riding in the street is a death sentence, and the (very wide) sidewalk on 31st has been permanently blockaded by mayor frey π«©
Looks like the router currently uses the north sidewalk of 35th. We could include either of those sidewalks, then we've have the connection and we can designate any individual component of it a recommended walk bike.
Avi, why did the router not use 40th instead?
Ah, it's probably the result of start/end locations. I haven't been able to reproduce a route where it goes with this over 40th. Can someone add some generalized start/end points (i.e., start at intersection 1 and end at intersection 2) that produces this?
Powderhorn Park to Painter Park does it (but not the other way around)
OH IT'S BECAUSE 1ST IS ONE WAY ONLY
starting point: 44.94130, -93.27736 ending point: 44.94072, -93.26981
I'll email you a screenshot
That's right. Since 1st is 1-way northbound, Painter >> Powderhorn follows the network. (This appears to outweigh using 35th from Blaisdell to 3rd Ave.) And for the same reason, Powderhorn >> Painter uses the sidewalk of 35th because the looong workaround on 40th is so much slower. A network departure by the router suggests that there's a gap worth trying to fill -- hence the suggestion to make the 35th overpass a walk bike.
Should 1st even be on the network as only a painted lane? I suppose traffic is lower but Blaisdell is two-way and curb protected Might be worth adding 38th bridge sidewalks to the network, since those are much better than 35th
I think that's a fair point. I'll go and take a look today
38th scares me
Removing 1st could be a good place to start.
I removed 1st - when Avi get a chance to push the deploy, we can recheck it to make sure 40th is chosen instead
I think the north sidewalk on 38th is wide enough to bike on at least. Its not a pleasant experience but I think its at least possible.
damn, it's still recommending 35th instead of 40th if starting on the east side and ending on the west side. if we add the 38th crossing, the 40th bikeway will be bypassed which isn't good either
I wish there's a way to mark 35th crossing as undesirable and that if must be crossed not at 29th or 40th then choose 38th instead
this looks like an area that could really benefit from a pedestrian and cyclist friendly bridge
Should be done in 1β2 years π€
I will be in my thirties *sigh* I feel for all the people who will be older than that having waited most of their lives for better infrastructure
There is a time penalty applied for sidewalks, so it will likely still favor 40th for many rides. One thing you can do is add that sidewalk as a suggestion and then check out the Travel Demand Model >> Show simulation data. This will give you a sense of how many trips would use that new segment and which segments would lose trips as a result.