Does anyone know why the flex posts were removed along 28th?
They just naturally get destroyed over time (by cars driving over them). Often they don’t get replaced
“The 26th and 28th corridors have had a ton of construction or construction related detours up and down both segments which included a two way bike lane on 28th from roughly Lyndale Ave to Cedar Ave due to the greenway being shut down. We could have probably done a little better job keeping up with some of the blocks between projects but we are planning hit the corridor once projects start to end. “
literally a “you’re on your own kid” strategy for the most vulnerable users
Another reason why flex posts aren’t real protection… Curbs don’t disappear and need replacement
Or god forbid an actual bollard
I will say that contacting the city of Minneapolis public works has generated the most hair-pulling experiences this summer for me. Zero accountability, zero self-awareness, zero sense of “oh we should’ve done this better and here will be out we’ll be moving forward.” I get better responses from public works staff in the suburbs and counties
sorry, this will be a little hard to parse because of the limited technology. the responses to the right of the dashes are from the city. May I ask why it took so long between the surveying crew putting the cones in and drawing the circles and then the implementation? By my count, it took closer to two months for these two activities to happen, leaving a big gap where cones got squished by vehicles. -- The marking out of the work needs to be completed before the crews can be scheduled. The scheduling of the crews is dependent on crew availability, and it is independent of when the work is painted out on the street. The same thing happened with the speed bumps where the trenches were marked out for over two weeks before crew put in the bumps. My bike tires took some life off due to those trenches, and til this day, I'm not sure if it was because of my complaining that got the city to finally go out there to fill in the bumps and if I hadn't spoken up, how many more weeks would've passed? -- The marking out of the work needs to be completed before the crews can be scheduled. The scheduling of the crews is dependent on crew availability, and it is independent of when the work is painted out on the street. As far as the trenches go and placement of the speed humps, the trench placement takes much less time than placing the asphalt of the speed hump. Similarly, 40th St was supposed to get curb-protected treatment with construction written here between August and October. Til this day, I still don't see any work being done here and I get to bike past smashed flex posts. -- TM &R staff has received the funding on October 14, 2026 and will begin to schedule this work. Finally, 26th and 28th have been without flex posts for a substantial amount of time. I track these things people users of Bike Streets talk about challenges of having infrastructure that is supposed to exist just be gone out of nowhere. What is the plan for 26th and 28th in Uptown? Can we expect that it'll just be painted bike lanes from now onward? -- The 26th and 28th corridors have had a ton of construction or construction related detours up and down both segments which included a two way bike lane on 28th from roughly Lyndale Ave to Cedar Ave due to the greenway being shut down. We could have probably done a little better job keeping up with some of the blocks between projects but we are planning hit the corridor once projects start to end.
also lol guess who gaslit me into believing the trenches I was biking over for two weeks was due to centerpoint construction but in reality was because of the speed bumps that I had suspected all along?
we love a bike ped coordinator whose entire job is to give you answers out of his ass instead of actually doing the legwork to get you the right information.
I understand the sentiment, but at the end of the day construction projects are an incredibly complex job. The way we default to in the US is to choose the cheapest option, which means less planning out of precise timing and logistics that keep the road network as disruption-free as possible. Yes, it’s possible to make these projects happen quicker and with less misses, but it is much more expensive to pull off (detailed planning, coordinating different construction crews to coincide, delivering equipment/materials, etc). It’s much cheaper and easier just to block things off for a few months and get it done when it gets done. I’m not saying it’s the right way, I would also like it if we spent more to do these projects right, but just noting that this is a symptom of a much larger system of how we do construction in the US through tons of separate private contractors rather than a coordinated system.
All this to say, it would take much more than individual city employees to change this. Probably needs action from legislators.
Do you know the book "Killed by a Traffic Engineer"? I think a lot about that book at the role that planners and engineers in whether preventable deaths and injuries occur or not. Sometimes, I talk to planners and engineers who work on projects for bike/peds, and I sense that it's a 9-5 clock-in/clock-out for them. That really causes my blood pressure to rise. I've also talked to people who truly get it and who truly truly deeply care, and I get sad that these people are probably stymied in their own co-working relationship with colleagues who don't give a shit. You really would think that the city would've taken more care and consideration for construction in one of the densest parts of the city, but alas, that's not the case. The construction updates are also non-existent. You and I can go look up construction project updates elsewhere in the metro and expect reasonable answers to when things will happen and what will happen each week, but then I go read a City of Minneapolis construction project page and nothing is up-to-date and you don't even know when and where things will happen. MPRB is different though. I love those folks. I got immediate answers about the Theodore Wirth Parkway construction when I reached out, and their customer service has been on-point when I asked about the connecting trail on France that leads to Cedar Lake.
Yeah, the communication is poor for sure
I think part of the obfuscation of information is due to city staff not wanting to answer questions and be hold accountable for upending neighborhoods. They're just banking on people who care but probably don't care enough to go looking for answers in the city.
It would not surprise me if the city staff legitimately did not know those exact timelines due to how many layers of contractors they probably go through. Safer just to stay vague since things shift so much. Unfortunate
One more thought on construction in general: An argument could be made that having everything done under one agency could actually save costs in many cases by eliminating bureaucracy - see the Park Avenue Viaduct project in NYC which is on time, under budget, and involved almost zero disruption to train service by using this model of centralized planning under one contractor. Maybe this is a way we can advocate for more sane construction planning and in turn better communication to the public since there can be clear plans in place
When a different company is contracted out for every piece of the puzzle you can’t rely on a tight timeline. One thing goes wrong/takes too long and everything after gets thrown off
I agree! We shouldn't live like this! I think I should formulate my response to the email to ask about how I can advocate so that construction is more predictable and thoughtful. I get frustrated because I have to pry really hard to get any sort of answer. I've also gotten the wrong answer with no acknowledgement or apology that I was told incorrect information. It's also probably because I haven't done the best job in expressing that I'm asking these questions because I want to know what are the steps that can be taken to make construction less stressful for residents moving forward and not because I'm asking for a head on the stake. The devil is in the details! This could've been so much better!
the most recent correspondence I shared was with Lonn for the city