Created
40th street bikeway getting concrete curbs. City says 3 weeks on website. From Dupont to Stevens
Is the construction passable or is the city dumping bikers onto the road?
Project 1-pager: https://www.minneapolismn.gov/media/-www-content-assets/documents/40th-St-Bikeway---One-pager-(digital).pdf Project page: https://www.minneapolismn.gov/government/projects/40th-st-bikeway/
Huong D accepted this suggestion.
Drove by it today, taking a left off Blaisdell and turning onto Nicollet, they had the orange signs up with white "no thru traffic" like they've been doing for the roundabouts they've been building. Basically made the section one way, but I was able to drive through, so I'd imagine others are driving through as well (public works left these same signs by my house at Harriett and 33rd for literally 2-3 months without doing anything lol, so I've grown to not trust them at all!) They pulled out all the white sticks and it looked like they were cutting into the road where those were, but the bikeway looked rideable other than that. There should be *less* cars, but I was able to drive through, so I'd watch for them.
I biked through this yesterday not knowing it was there. It does dump you into the road, but the road is currently just blocked off the whole way, as is at least Blaisdell at 40th going north, but I thought another as well. I imagine when construction really begins the road won't be as passable with things dug up, trucks, etc. Sure wish we were getting this treatment east of there, though I avoid the 40th street hills as much as possible. Hate going down them—especially with a stop sign at the bottom!
I have many thoughts about 40th west of I-35W. It's quite bumpy and needs repaving and I can't find any webpage on when the city will get around to doing that. I have on my list of to-dos to go bike over there with my camera on to capture how bad it is and submit it to 311
It's really awful. I saw 42nd is getting bike lane treatment somewhere? Is it far enough east or only central?
I'm not sure about that one but you can't pay me enough money to bike on 42nd. that painted bike lane is hella scary and people speed
*east of I-35W
I think somebody was mentioning it's getting curb protected lanes. I'll see if I can find it
https://www.minneapolismn.gov/government/projects/42nd-st-bikeway/ omg you're so right! whoa that's gonna be so good! 2027-2028 timeline so I don't when they'll actually construct it
You beat me to it! Yeah! Isn't that something to look forward to?!
YES, I look forward to less teeth-clattering while biking through the area. that 40th bikeway east of I-35W, god help us all. but also 2027-2028! so late! they also delayed some other construction projects from this year to next year and I fear that when 2028 comes around, they might delay the project even more. The Theodore Wirth repaving is the only construction project within MPLS proper that I've been happy with. all the other construction projects are dragging on and on and even this curb-protection project for 40th was supposed to be completed by now but they just started.
It is infuriatingly slow, especially when they fast track highway projects.
Last Activity
Duration
Over 2 weeks
Status
Dismissed