Created
The Nokomis Ave bridge over the creek is under construction. You have to use one of the ped bridges a block down on either side.
omg the amazing stuff we need to know; I'm gonna add to OSM and have it show up here
Anticipated open date is fall 2026. What's fascinating is the city provided a detour map for vehicles and pedestrians but not bicyclists: https://www.minneapolismn.gov/media/-www-content-assets/documents/NokomisAveS-over-MinnehahaCreek_DetourRouteMap_3.18.26.pdf
Huong D accepted this suggestion.
The bridges on either side are probably designated ped only. You should probably dismount and walk them or at least ride it slow.
That makes sense; it's marked as a residential street in OSM with an anticipated open date in fall 2026. I'll revisit the map when it opens and add the bridge
The bridge is reopened now
❤️
Thanks, Drew. I updated this in OSM.
WAIT HOW DID I MISS THIS
Last Activity
Duration
Over 2 weeks
Status
Dismissed