Created
1 block of sidewalk widening here would make it an S-tier connection from the LRT trail to the 20th Ave bikeway and everything north of here. Literally only 500ft of sidewalk. Bonus points if the bikeway striping continues through like on the north side of Franklin
Ideally also extend south to 24th St, connect to the shared use path being built on the east side of Cedar
https://www.hennepincounty.gov/cedar-avenue unfortunate that the reconstruction won't include this section
what if you and I email transportation@hennepin.us with the exact ask on widening the sidewalk at this section and see what they say?
Will do
Done
Update: I just learned that the cedar sidewalks are now fenced. That leave an unbroken wall that is impossible to cross on foot between 6th St and 26th St.
So discouraging. I think somebody should investigate the financial relationship between this city & the fencing company at this point.
the amount of unusable infrastructure in this city due to fencing deserves a 60 minute investigative episode. there needs to be a documentary
also sent an email to Hennepin County: Hi! I'm reaching out regarding Cedar Avenue north of the Hiawatha LRT trail. I know that you're working on the reconstruction of Cedar Ave south of 24th St. What are your current assessments of the conditions on Cedar Ave north of 24th St? Currently, there are fences that block the sidewalks. I would like to understand the plan for the area and how we can provide a safe way for bikers and pedestrians to connect from the Hiawatha LRT trail to the 20th Ave bikeway in the north using Cedar. Specifically, how do you currently assess the sidewalk conditions here? I think they're narrow and not to the ADA standards that I know Hennepin County strives for. Would it be possible to expand the sidewalks?
oops false alarm - this was all fenced off earlier but I checked today and it’s open
but narrow, yes. there’s big concrete barriers to choke it down
no response yet, but i did learn that this segment is on the county’s 2040 bike network plan: https://www.hennepincounty.gov/-/media/Hennepin-Headless/Hennepin-Gov/government/projects-initiatives/transportation/biking/planned-bikeway-system-map.pdf?rev=6a8603da2b2b4d75be6b874b5a0580a8&hash=4F4CA920F71D79ECED052F68DCDEDC40&shem=aimgspe,
No answer here yet but it usually takes a week for me to get an answer. I think it’s because the person I correspond with usually takes some time to look for answers in others before getting back to me. It’s a refreshing change from the alternative. Hey I also went over there to look and the fencing is really all screwed up. The one that is under the bridge north bound is completely blocked off and you can’t pass it at all on the sidewalks and the one that is southbound you can squeeze by
“Good morning, Calvin. Thank you for your email, and for your sharing your concerns about the bikeway connections in this area. The segment between the Hiawatha LRT trail and the Cedar bikeway facility North of 20th Street is an identified bikeway gap at the County, and we’re working internally to see if anything can be done here without a larger capital project. The segment south of the LRT trail connecting to the new facility on Cedar ave south of 24th is also on our radar. We currently do not have any projects scheduled on these segments in the near term as it stands, so I cannot promise anything definitive at the moment. That being said, our staff in Planning and Operations are looking at the avenues available to us with the hopes of delivering a more comfortable experience for active transportation users when possible. Please let me know if you have any questions, and thanks again for your message. Julian Fernandez-Petersen”
Good afternoon, Huong. You are correct that the Cedar Avenue reconstruction limits end at 24th St E. The City of Minneapolis handles the operations/maintenance of sidewalks along most of our county roads in Minneapolis as per our maintenance agreements, and MnDOT has some influence over the ROW under their bridges as well. We are aware of some of these sidewalks being fenced off along Cedar. If you have any questions about these closures, I would encourage you to reach out to MnDOT and the City of Minneapolis for a more complete picture of the situation. The segment between the Hiawatha LRT trail and the Cedar bikeway facility North of 20th Street is an identified bikeway gap at the County, and we’re working internally to see if anything can be done here without a larger capital project. We currently do not have any projects scheduled on these segments in the near term as it stands, so I cannot promise anything definitive at the moment. That being said, our staff in Planning and Operations are looking at the avenues available to us with the hopes of delivering a more comfortable experience for active transportation users when possible. Please let me know if you have any questions. Warm regards, Julian Fernandez-Petersen
I need to send photos of the fences. I don’t get what’s going on where one side is passable and the other side is not
There was a sign saying it’s for construction on the bridge but idk if that’s true
I know, there was no construction! Also there's no construction Cedar Ave south of 24th St either??? Is that happening this year? I'm so confused
Just got off the phone with someone from the city and he said that he got wind that construction here just started and it was very very delayed. I have no idea what they’re planning on constructing in the area with this late of a start but damn, not a good picture for the construction scene in MPLS.
Good morning, Huong. The reconstruction project started construction this year, but only between the Midtown greenway and Lake Street. In 2027 the segment between the greenway and 24th will be constructed. The fences with the message from Metro Transit about closure until early 2027 are likely related to the Franklin Avenue Station Renovation project and other ‘Renew the Blue’ initiatives along the Blue Line LRT. I asked one of our transit planners about them, and he reached out to Metro Transit for clarification. They got back to us earlier this morning and, According to Metro Transit, these fences are in place as they work to install a new permanent fence along the sloped area underneath the bridge. I have been told that as of Tuesday earlier this week the fences had been shifted to allow for sidewalk access. Let me know If this answers your questions, and if there’s anything else I can help answer for you. Wishing you a lovely Friday and Halloweekend,
for every cortisol rising interaction I have with the city of minneapolis, talking to Julian is like a lil antidote
wonderful :) yes i have gotten a few from julian too i went by last night and the fences are scooched off the sidewalk disappointing that they are adding permanent fencing though :/
lol better than my closed out 311 response where I asked them to go out there and checked out the accessibility concerns and they freaking closed my ticket with "MNDOT is working on the bridge and the area is closed for public safety"
“public safety” 😵💫
Thanks Huong, It looks like the project contact on the renew the blue website is Kevin Murray at Metro Transit. It seems they have an email dedicated to community input: Franklin@metrotransit.org . I would suggest perhaps starting there if anything comes up related to this project. I understand your frustrations related to the sidewalk closures in this area. As you can imagine, this is an issue that is being discussed at the leadership level amongst these municipalities. Unfortunately I don’t have much news of any kind to share. Best, Julian.
Franklin@metrotransit.org - make sure to send complaints over. there has to be some level of accessibility here.
Been following this and will try to email later today + pass to some buds.
THANK YOU FRIEND
Hello Huong, Your contact information was passed along to me by Minneapolis 311 regarding the sidewalk being blocked on Cedar under our light rail bridge. It in fact was blocked for a while but the other side of the street the sidewalk was open but we did not have signs directing pedestrians which was our mistake. Thankfully, as of recent, the other sidewalk is now open – so both are. I’ve attached pictures and visited the location this morning to double check. Please let me know if you have any additional questions. Sincerely, Pam Steffen Senior Manager, Community Affairs Metro Transit, a service of the Metropolitan Council
Great question regarding duration of project. Now, the time frame is end of January where decorative fencing will replace the temporary fencing. The permanent fencing will mimic today’s along the sloped area under the bridge and will be next to the sidewalk (see attached). Please let me know if you have additional questions – happy to assist.
decorative fencing…
If you can’t even bring yourself to call it what it is, maybe you shouldn’t be building it :/